An oversized or undersized system installed without a real load calculation will short-cycle or never keep up, no matter how good the equipment is. Every quote starts with a real Manual J assessment, not a tonnage guess.
A large share of comfort complaints in existing Berkeley homes trace back to sizing at installation, not a failing part. Assessment comes before equipment selection, every time.
The details that separate a proper install from a quick swap.
We walk the property room by room measuring insulation and window exposure before a single equipment number gets written down.
We don't skip the parts that would cause problems at resale.
Two separate warranties, both in writing, both real.
Old ductwork gets evaluated, not just inherited by the new system.
A real walkthrough, not a stack of paperwork.
From assessment to final inspection.
We measure insulation, window exposure, orientation, and square footage.
We recommend based on load data.
Existing ducts get pressure-tested and inspected, sealed or resized as needed.
New equipment often has different requirements — we verify capacity before install day.
Includes equipment placement, line sets, drainage, and startup commissioning.
We handle permits and coordinate the final inspection, useful if you sell the property.
What to expect.
An in-person assessment gets scheduled.
Assessment equipment arrives on-site.
Options based on actual data.
Warrantied once the job's done.
Feedback from completed installation projects.
Adding a home addition meant our old system couldn't cover the extra square footage. They recalculated the whole house load instead of just adding a mini-split and hoping.
— O.Achterberg, homeowner
Historic home with plaster walls that make duct modifications tricky. They found routes through existing chases instead of cutting into walls we wanted to preserve.
— I. Constantinou, homeowner
Home office recording setup needed a quiet system, and they specifically sized and placed equipment to keep noise down in that room.
— U. Nnamdi, remote worker
Multi-generational household with very different temperature preferences upstairs versus down. Proper zoning during install solved an argument that had been going on for years.
— E. Malinowski, homeowner
Basement apartment conversion needed its own independent system separate from the main house, and they designed the whole thing around that specific requirement instead of trying to tie into the existing ductwork.
— F. Castellucci, homeowner
What people usually ask before installing.
Whoever installed the original system may well have guessed wrong on size, and copying that number just carries the error into the new equipment.
Most residential installs finish in one to two days depending on ductwork.
We take care of pulling and filing the paperwork ourselves so it's not one more thing on your plate.
A workmanship warranty backs the install.
Undersized ductwork gets caught during the assessment and corrected before the new system ever gets connected to it.
Options covered at the quote stage.
We show you before we go.
You are welcome to follow along.
A quick practical rundown, not just paperwork.
Our coverage extends through Berkeley and nearby zips — call to schedule.
Schedule My Assessment